A lift station can eventually become a concrete structure that is filled with pumps, pipes, valves, controls, as well as electrical equipment, however its efficiency is generally established earlier. Flow calculations, site elevations as well as system pressure, wastewater characteristics, peak conditions access to maintenance, controls and capacity in the future all impact the type of structure that will eventually be built.

Image credit: romtecutilities.com
For project owners comparing the best lift station designers, the more useful question isn’t simply who can specify pumps. Who can translate site conditions into a complete, practical system that is easy to maintain, install, and use?
Gravity Has Limits
Gravity is generally the most efficient way to convey wastewater, but the development pattern and terrain don’t always cooperate. New residential, commercial, and industrial buildings may be too low or too distant, or in locations where extending gravity sewers isn’t feasible.
A lift station can provide the required force mechanically to transport wastewater from one part of the collection system to the next. It is important to consider both the operational conditions of normal operation and those that may be less practical, such as most inflows at peak, maintenance on the pump and equipment breakdown, as well as future demand increases.
The most effective companies in wastewater design need to look at the whole issue instead of just treating the station.
Existing infrastructure makes the problem more complicated
The main issue isn’t building new structures. While maintaining essential wastewater infrastructure municipalities frequently need to replace or upgrade aging stations.
Existing wetwells, forcemains electrical services and controls along with the site’s boundary, as well as downstream infrastructure can limit the design. Engineers must determine which elements can be reused and what needs to be replaced as well as how the new components will integrate with the current system.
Romtec Utilities works across municipal commercial, private industrial, retrofit and replacement programs, allowing pumping systems to be developed around the specific ownership and operating requirements of each project.
Stormwater is governed by a variety of rules
The most efficient stormwater system designers must use the provided search terminology to solve any hydrologic issue. Stormwater systems can undergo dramatic changes in volume depending on the quantity of rain, drainage area capacity for detention, and permissible discharge rates.
For example, a station that serves a detention site might require a temporary hold of the runoff, and then pump it out at a set rate. Engineers need to take into consideration the flow rate, the head condition, the demands of the environment, the flood management objectives, and the particulars of the drainage system that is receiving.
Prefabrication is a way to move the work off-site
Field assembly is a demanding process that could result in delays, scheduling conflicts, delays, and change orders. Romtec Utilities prefabricates equipment before it arrives at the site of the project.
The process of completing more assembly and quality control work in a controlled environment can decrease the amount construction needed in the field. According to the method of project implementation that was outlined by Romtec Utilities, some projects that might otherwise require weeks to complete could be reduced to days depending on project conditions.
The Commissioning Process is a crucial element to engineering Success
The station can’t be proven just by the fact that every component has been installed. Romtec Utilities is an installation advisor and will follow the construction process from start-up, through control panel inspection, pump operation, testing the system, and personnel training. The manual also contains details that operators could refer to when they are maintaining the system, or thinking about future expansion.
This final stage is important to owners who are looking for the top lift station designs. The best engineering will produce more than a good set of drawings. It should provide the owner with a working system and a skilled staff, as well as useful documents, and equipment designed to meet the demands the station will encounter during normal operation.